Saturday, June 20, 2020

Report No.21

Trains are running most weekends.
No track added yet.
Working to make another video.
More details Added.

New Engine


Added a Bachmann Heisler to the roundhouse as Sierra Ry No.9. See details on the refit in


Marble Spur






Scratch built a stiff leg derrick, fake marble blocks and slabs for the Marble Spur. Base for derrick is real marble from one of the quarries in Columbia.
Made a removable block flat load. All flats have a magnet to hold it in place.

Patterson Mine



Bashed a small coal tower for an ore shoot at Patterson Mine.

New Buildings




Dave Connery gave me some nice houses from his now decomissioned South West Side Lumber Co. Top one is next to Peppermint Creek. Another at Tuttletown.

Tuttletown


Finally added the station sign to the Tuttletown shed. Reworked a Bachmann hand cart on right.

Saloon


Back behind the Sierra Ry. General Office was a saloon. I had a Rite Aide birdhouse that works with a name change from General Store to Saloon.

SOME HISTORY


8-14-93

Yea, thats me driving and the famous RR photographer Al Rose in the, as famous, Sierra Ry No.8
Model T.   
Al Orozco manning the turntable. I'd like to make that some day, when I find a Model T kit to bash.



Sunday, May 10, 2020

Report No.20

More work done this weekend. Ballasted the turntable yard and filled in the pit. Made roundhouse doors.


Sunday, April 26, 2020

Report No.19

Hi,
Made a short video of the Jamestown yard today to show how it is looking.
Ran the No.8 yesterday and the No.10 today.
Here are a few photos of the roundhouse and machine shop first.











Sunday, March 29, 2020

Report No.18

Hope you are well in this trying time, we are healthy and safe for now.

Early March I decided to just move and make the Tuttletown loop where the track ended at Patterson Mine.



Then I added Tuttletown siding.


I had also been working on the turntable table. With the loop at one end and turntable at the other, I will be able to run trains smokebox first, both East to Tuttletown and West back to Jamestown. No more having to run the engine around the train.




I am now working on the Machine Shop and Roundhouse. They are made with the same Sturdyboard foam board from Dollar Tree I made the Freight Deopt out of.


As it looks today. They are condensed to fit the end of the table. Roofs will be black, its some leftover sand textured paint.





Sunday, February 2, 2020

MY LOCO SOUND

Mid January I ordered two MYLOCOSOUND cards for engines No.8 and 10.
I bought them from G scale graphics.
Ordering was easy and quickly shipped.
They were $79.00 each. I also ordered one remote programmer too.
I installed one in No.8 first and wired it to control the chuff/exhaust from the throttle power. This way I can adjust the chuff speed with the remote programmer. The alternative was to wire into the cylinder switches, but that would give only half the chuffs per wheel revolution.
I set up it so the air pump, water injector and safety valves popping off run automatically.
I have not wired in the bell and whistle controls, I need to order a relay for the receiver for that to work.
As of right now, I have not done No.10 yet. I will as soon as I'm done with the Jamestown turntable.
I am really happy with the added realism MYLOCOSOUND contributes to the operation fun.
Here are three videos I made to hear the MYLOCOSOUND in action.


Sounds No.8 makes.





Making up Train 22 East January 1, 2020.




Train 22 East Leaving Jamestown.



Tuesday, December 17, 2019

Report No.17

We had some good rain the last two weeks of November.
When not in use, I remove all equipment and structures.
I've been keeping the whole Jamestown yard covered with plastic.
Some work done October to December.


Finished the Jamestown watertank, (1897-1939).

The tank, deck and roof are made from Dollar Tree Readi-board. Redwood frame is from a 15+ year old redwood tree we grew, that did not last the drought. While cutting the redwood, the table saw tried to cut off the tip of my right thumb. Three stitches and two months later it's fully healed, minus about 15% off the left side.


Put the windows in the Freight Depot.

Got all the wood cut and started the Jamestown and Angels turntables.

Redwood is from an old picnic table that finally fell apart after 35 years of use.


12-15-19 Train 21 west leaving Zach Jct. after dropping hopper at Patterson Mine.

Same train at Woods Creek.


Sunday, October 6, 2019

Report No.16

I was off for vacation last week. We went to Moneterey and Pacific Grove. When we got back I got some things done.

Covered water drain between outer track and rock wall.
















Finished Freight Depot roof.















Checked fit of Turntable table before taking to basement to work on.
On Tuesday I hiked the ex-Monterey Branch,(pulled 1978), from Lover's Point, (near site of the long gone Pacific Grove Depot), to Asilomar station site, 1.6 miles. The trail is not as well used as the trail back through Monterey. I went around the moble home park where the PG station was till it was burned in 1964. At Asilomar station site is this recreation built in 2005 of the passenger shelter built by the SP, 1911-1964.  Asilomar passenger shelter is at Sinex Ave and Crocker Ave, just west of Pacific Grove. The 1960 map below is in the lobby of Borgs Motel, my starting point. I took 17 Mile Drive north then Jewell back to the motel.
Nice easy hike, though you have to watch out in the golf course for golfers Ting off next to you, I just waited till they were done. One T they waited for me to pass next to them. Other parts feels like your walking in peoples back yards.



I liked it so much, that I had to make one for the hot summers at Omega Siding. I did leave out the interior wind break walls. Will make the roof sign next.

Train 22 East 10/5/19. Naked Ladies still going strong.


Fall colors at the entrance to Table Mountain cut.






Saturday, August 31, 2019

Report No.15

They are back.
In the original Report No.8, Oct. 24, 2018 I informed about the Naked Lady plants.
 I added update photos today to that post to show the plant cycle in the garden.
Here is a short video from last Saturday 8-24-19 of Train 22 West going through this years crop of flowers that just shot up last couple weeks. All of the green leaves have been gone since end of July.
Finally got the last of the battens on the Freight Depot last week and paint on the track side last night.
Have not decided on final color yet.
The computer program has those cars at the Freight Depot today, I didn't stage them.
Still running 2-3 trains a weekend. I keep the Jamestown yard covered to keep rain of tree stuff off it. I usually uncover it Friday evening and set out cars.
I'll have to do a post on the car tags and magnets to mark where each car comes from and returns. Makes it easy setting out cars.

Sunday, June 2, 2019

Report No.14

Worked from Zach Jct. towards Tuttletown. Added in Patterson Mine spur.
Since Tuttletown will be a loop, Patterson Mine will be passed twice each day.


Zach Jct towards Patterson Mine.



Patterson Mine spur on right.

Also started on Mormon Creek trestle between Zach Jct and Patterson Mine.



Saturday, April 27, 2019

Report No.13

Made a little progress to Zach Junction towards Tuttletown.


Leaving Marble Spur going towards Zach Jct.

Zach Jct.

Installed a rock wall behind the Jamestown Yard and am working on one below Zach Junction to where Patterson Mine will be.


New rock wall and temporary birdhouse watertank.

Also added the car stop bunker in the Jamestown Yard.