Wednesday, August 15, 2018

Report No.2

House /freight depot siding and main linked and tested today, again w/ No.8 Climax, two lumber flats and comb. 5.
Loaded train on outer AB track next to rock wall. Ran train west on main and backed on inner AB track. Dropped the 5, pulled flats west, backed to freight siding and dropped them. Unloaded them, got the 5 and put on west end of flats, ran around, made up train and ran back to outer AB.
A short operating test w/ no problems.

Looking track west
Looking track east

No comments: