My building of a G scale 1:22.5 ish garden railway with the Sierra Railway's Angels Branch as its theme.
Wednesday, November 26, 2025
Sunday, May 4, 2025
Report No. 45
WELL...
Other projects happened, and...
A week ago I finallllyyyy cleaned things up. That took about 3 hours.
Then I ran a maintance train from Jamestown to Melones and back.
Wednesday, January 8, 2025
Report No. 44
Happy New Year
At the end of a hot summer, September, a lot of trains were run. I had the railway operating longer than before. For a full 30 days.
Then a deck project started. Family for Thanksgiving. Polar Express and Christmas.
And sadly my mother passed away in the middle of the Polar Express season.
The Jamestown yard sat covered for 3 months.
I plan to get it ready to operate next week, since NO rain is in the forecast for 10+ days.
The oak trees this fall were very happy and dropped more acorns that I can remember in the last 30 years.
You see why I cover the Jamestown yard.
I should have it ready for operation in a few days.
And no, the Hotel Nevills is still not done!
Wednesday, March 20, 2024
Report No. 43
My first through train video.
I remember one of Rik's Peckforton Light Railway videos that had some outtakes on frustrations behind the sceens. Ohhh was it. Cars, trucks, firetrucks, planes, helicopters, FedX. UPS, USPS, and wind. AND DERAILMENTS that only happen when your showing off your derailment FREE railway to friends.
WOW, not sure if I can do that again. But child birth gets forgotton most of the time.
Here it is. Mixed Train 22 East, Jamestown to Melones.
The one and only Daffadill to come out this year.
Monday, February 19, 2024
Report No. 42
Work Between Storms
Between storms I worked on the Stanislaus River due to the banks were eroding. It was time to do some rockwork to keep the banks from sliding because the Iris I planted last year were in peril. So I got my boots on and went rock hunting.
Also I put in a lot of slate retaining walls along this section between El Rico Siding and Melones due to lots of dirt and rocks tumble down the hills onto the road bed. Mostly caused by birds digging in the leaves. The slate is in the hill between the tracks and car road above because when the water main was installed to the houses, it was back filled with dirt/slate from some where in the Jamestown area.
Monday, January 29, 2024
Report No. 41
Happy New Year
Spent some time balasting the right of way last week between rain showers and stained the Stanislaus River Bridge yesterday.
Last week the high was 45 F, today is was 75 F here. It feels like spring, but in two days there is a week of rain forcast.
I ran a train yesterday and today, and will tomorrow. After a few realignments,the right of way is derail free.
Thursday, November 30, 2023
Report No. 40
It has been a while since full scheduled trains have run. There was a reason for that.
As of Nov. 22nd I have retired from the working force and now have the time TO RUN TRAINS.
So Nov. 26th, I cleaned up the Ry and the 27th,-29th I ran scheduled trains.
Everything is working ok, but everything needs some level of maintenance.
Here are a couple photos and a short video.
Soon I will get down to making a full train operation day video.
Monday, October 30, 2023
Report No. 39
Work Train
Due to the fall acorn bombardment, the Woods Creek trestle and Pepermint Creek bridge needed some work to repair dislodged or broken parts, so a work train was dispatched.
Engine No. 8, the work flats,1877, 42, flat 49, and combine 5 were sent out with tools and lumber for the repairs.
Sunday, April 23, 2023
Report No. 38
Hi,
Yesterday I had an open house like the one in October after the Westside Reunion occured at the Sonora Senior Center.
About 15 people showed up while I ran two trains.
Saturday, February 11, 2023
Report No. 37
Hi all.
The Angels Branch has survived the many "atmosperic rivers" we had last month. I recorded 17 inches of rain in my guage during that period. Some maintenance will need to be done restoring ballast and lost grade material, but it is operational. Also the river bed below the bridge is about 6 inches deeper now.
I took February 9 and 10 off for my birthday, now I don't feel bad about getting that senior discount any more. I spent the first half of my b-day cleaning and realigning. Then ran a maintance train with No. 8, then a scheduled mixed train to Melones with no. 10 and back to Jamestown. The next day No. 9 took the train. I will run another on Sunday the 12th.
Between Christmas and New Years I finished the superstructure of the 2nd turntable that will be use at Angels, but for now it is used at the end of the track, Melones. I will be ordering more nut/bolt castings soon for detailing it.
Also I built a Pola/LGB small freight shed plastic kit and have to make a platform for it to go to Melones.
After that I HAVE to start on the Hotel Nevills because the Sierra Seminar is comming up on April 23 and I will want some progress to show.
Thanks for checking in on the Angels Branch.