It has been a while since full scheduled trains have run. There was a reason for that.
As of Nov. 22nd I have retired from the working force and now have the time TO RUN TRAINS.
So Nov. 26th, I cleaned up the Ry and the 27th,-29th I ran scheduled trains.
Everything is working ok, but everything needs some level of maintenance.
Here are a couple photos and a short video.
Soon I will get down to making a full train operation day video.
Train 21 West leaving the McArdles Switch.
Upon train 21 West returning to Jamestown, No.10 is finishing switching the yard by pushing coaches 5, 6 to turn on the turntable and a oil tankcar retrived from the main siding going to the oil spur.
Train 21 West with No.8 leaving Tuttletown for Jamestown.